Nationwide service · all 50 states929-685-1051Initial response within 1 business day
New customer offer:10% off the manufacturing portion of your first approved custom packaging production order—up to $500.Terms apply →

Extend your packaging comparison

Understand why your packaging costs what it costs.

A Packaging Cost Engineering Report separates known cost drivers from opportunities that still need pricing, engineering or validation. It builds on Compare My Packaging and your existing DBS specification.

Five areas of analysis

Structure & materials

Dimensions; board grade/caliper/flute; carton style; dieline efficiency; material utilization; sheet nesting; excess material; box-to-product fit.

Printing & finishing

Colors; print method; ink coverage; coatings; lamination; foil; embossing/debossing; spot UV; windowing; specialty finishes; hand assembly.

Production & geography

Quantity; setup allocation; tooling; plates; combination runs; repeat orders; digital versus offset/flexo; domestic and overseas production.

Logistics

Finished-box pack-out; units/case; cases/pallet; pallet utilization; dimensional efficiency; freight mode; domestic/international freight; air/ocean; DDP inclusions; final delivered cost.

Inventory & scheduled releases

Quantity; consumption; order frequency; storage; scheduled releases; safety stock; carrying risk; obsolescence and change risk.

Start with your available evidence

Current invoice · Existing quote · Existing packaging · Dieline · Specifications · Historical DBS orders · Competing supplier quote · Freight invoice · Customer consumption pattern. A physical box and incomplete information are valid starting points; DBS identifies the gaps.

Evidence before savings

The report explains what is known, the evidence behind each conclusion, the potential opportunity and what must happen next. Without actual pricing, findings are labeled Opportunity Identified, Requires Supplier Quote, Requires Engineering Review, Requires Freight Quote or Insufficient Information. No savings value is invented.

Documented reductions are separated by driver and reconciled to a quoted alternative under a stated quantity, delivery scope and functional basis. Quantity, production and freight effects must not be counted twice. Inventory and carrying-risk effects remain separate from delivered-unit costs.

Preserve what the packaging must do

Lower board weight, caliper, strength or structural integrity is never recommended simply for a cheaper quote. Depending on the proposed change, DBS may require samples, prototypes, compression or transit testing, production-line trials, food/contact validation or engineering review.

Continue through your packaging program

The reviewed report stays with your inquiry and customer account. Use it for supplier comparison, quote normalization, reorder planning and discussion of inventory or scheduled releases. Pricing, release terms and production remain subject to the existing quote and approval process.

Start with what you already have

Trust Center

Clear controls behind every order

See how your project is protected →
01
Private by design

Customer pricing, artwork, and account history stay protected.

02
Exact approvals

Artwork and proofs are tied to the reviewed file and version.

03
Owner-controlled production

A supplier packet alone can never authorize manufacturing.

04
Evidence-based updates

Payments, quality, shipment, and delivery require verified records.